Rush-Overland 40 MBTU Trailer Mounted Frac Water Heater Unit
Trailer Features:
- Heavy Duty Drop Deck Tri-Axle Trailer
- (12) 11R24.5 tires
- (6) Polished Aluminum Outer Wheels, (6) Steel Inner Wheels
- 75,000 Air Ride Suspension
- Rear Enclosure with Full Width Roll Up Doors to Cover Engine, Pump, and Manifold
- Trailer Neck Driver Side Walkway
Burner Features:
- Rush LPG Fired Updraft Type Burner
- 40,000,000 Btu Input
- Direct Spark Ignition
- Stainless Steel Burner Tips
ASME Code Section IV Heat Exchanger:
- 3″ Multi-Pass Heat Exchanger Contracted of SA106B Seamless Tubing
Burner Chamber:
- 1/4″ Steel Plate Outer Walls
- Ceramic Fiber Insulation Rated at 2,300 Degrees Per Layer
- Insulated Burner Chamber Top
- Stainless Steel Rooster Cone
Fuel Storage Tank:
- (1) 2865 Gallon LPG Tank DOT MC331
- Shut-Off Valve and In-Line Filters Located on Driver’s Side for Easy Access and Maintenance
- Electric Drive Blackmer LPG Pump
Control Panel:
- Water Tight Control Panel with Full Viewing Plexi-Glass Window
- Water Discharge Temperature Indicator with a High Temperature Shutdown
- Two Low Flow Safety Switches to Shut Down Burner if Water Flow is Lost
- Work Light Switches with Indicator Lights
- Control Panel Light Switch with Indicator Light
- Coil Outlet Pressure Gauge
- All Controls Will be Labeled Appropriately
Centrifugal Pump:
- 5 x 3 Vacuum Assisted Self Priming Centrifugal Pump
- Mechanically Driven
Manifold System:
- 4″ Schedule 40 Manifold Piping and Butterfly Valves
- Eight 4″ Brass Camlock Connections
Power Plant:
- Cummins Diesel Engine Model QSB4.4
- Positive Air Shut-Off System
- Air Actuated Twin Disc Clutch
- Oil Pan Heater
- Water Cooled
- Steel Enclosure with Side Mounted Doors
- 120 Gallon Aluminum Fuel Tank (Heated Traced and Insulated)
- Main Battery Disconnect Switch
Miscellaneous:
- 20 kW Generator
- Electric Driven Air Compressor with Insulated Enclosure
- Five Large Toolboxes Mounted Around Unit
- Hose Basket Mounted Under Unit on Passenger Side to Hold 4″ Suction Hose
- E.D. Work lights Mounted Around Unit for Night Operation
- Unit will be Sandblasted to meet NACE 1/SSPC-SP5 Specifications before Electro-Statically Applying 3 Coats of Corrosion Resistant Epoxy Primer and 2 Coats of Acrylic Urethane Enamel Paint
Gallery
no images were found